Helping Bega Group reduce emissions with large-scale rooftop solar

Bega Group is a leading Australian food and beverage company operating one of its largest manufacturing facilities in Western Sydney. To help reduce reliance on grid electricity and support its target to reduce Scope 1 and 2 emissions by 40% by 2030, Bega Group partnered with AGL to install a 1.23 megawatt rooftop solar system. Delivered under a 15-year Power Purchase Agreement (PPA), the solution provides access to renewable energy without the upfront capital investment in the solar system.

Aerial shot of Bega Group facility in Western Sydney
“It’s a major project for us and it provides local clean generation of power to sustain the operation.” 

- Andrew Harris, General Manager, Operations Milk Based Beverages, Bega Group 

The challenge

Food and beverage manufacturing is energy intensive, making reliable and efficient energy an important part of day-to-day operations. At Bega Group's Wetherill Park facility, the business was looking for a practical way to reduce reliance on grid electricity and lower operational emissions while supporting manufacturing operations and progressing towards its sustainability goals.  

The scale and complexity of the site also presented delivery challenges. The facility comprises multiple interconnected buildings, with restricted crane access and production continuing throughout the project. This meant materials needed to be safely delivered to several rooftop areas while minimising disruption to operations.  

The solar solution

A tailored rooftop solar solution was delivered under a 15-year Power Purchase Agreement. Under the agreement, AGL owns and operates the system, while Bega Group purchases the electricity it generates at the agreed PPA rate. This enables Bega Group to access renewable energy without making an upfront capital investment in the solar system.   

The solution includes: 

  • 1.23 megawatt rooftop solar system  

  • More than 2,400 solar panels  

  • Solar panels installed across interconnected rooftops  

The installation is equivalent in size to approximately 187 typical Australian household solar systems.1

Watch the case study video

Why Bega Group partnered with AGL

Bega Group selected AGL based on the proposed solution for its Wetherill Park facility and AGL's experience delivering large-scale commercial solar projects. AGL's renewable energy and decarbonisation expertise also helped support the successful delivery of the project across a complex operational manufacturing site. 

“Working with AGL, because they have such a vast network of clients and a lot of expertise and experience, we're able to quickly get on top of issues that they would see as common and perhaps that would be new to us.”

- Andrew Harris, General Manager, Operations Milk Based Beverages, Bega Group  

Benefits for Bega Group

No upfront capital investment 
No upfront capital investment 

With no upfront investment required for the solar system, Bega Group can preserve capital for priorities such as manufacturing operations, innovation and growth.  

More predictable energy costs
More predictable energy costs

Electricity generated by the solar system is purchased at the agreed PPA rate, helping provide greater certainty of Bega Group's energy costs.  

Reduced reliance on grid electricity
Reduced reliance on grid electricity

Generating renewable energy onsite helps reduce reliance on grid electricity and lower operational emissions.  

Access to solar expertise
Access to solar expertise

With AGL responsible for managing the solar system throughout the agreement term, Bega Group can benefit from renewable energy without needing to manage ongoing system performance and maintenance. 

Supporting sustainability goals
Supporting sustainability goals

The rooftop solar system is estimated to help reduce carbon emissions associated with electricity usage by 9% in its first year of operation, helping Bega Group progress towards its emissions reduction and broader sustainability goals.

Solar panel shot of Bega Group facility in Western Sydney

Project delivery

Installing more than 2,400 solar panels across several interconnected rooftops required careful planning, flexibility and a strong focus on safety. Restricted crane access and the need to work around a live operational site meant the original rooftop material delivery approach was not suitable.  

To keep the project progressing safely and efficiently, the project team established multiple material laydown areas and used elevated work platforms to transport materials to rooftop level. Temporary stairways and access platforms were also installed where existing rooftop access was unsuitable. This coordinated approach enabled the installation to be completed while minimising disruption to site operations.  

Tailored energy solutions for business

From rooftop solar and battery storage to integrated energy solutions, we're helping businesses take practical steps towards their energy transition. 

1The equivalent figure of 187 residential solar systems is an indicative estimate based on a typical 6.6 kW residential solar system referenced by the Australian Government. Calculation: 1,231 kW ÷ 6.6 kW = 186.5 (rounded to 187).