We have commenced decommissioning works at the Cairn Curran Scheme, with works estimated to be completed by July 2026.
The generator has not been operated since 2017. As part of the works, the 2 MW generator and transformer will be removed from the power station.
An update on works at the former Cairn Curran Power Station
Restoration is continuing safely and on track at the former Cairn Curran Power Station. This is part of AGL’s commitment to responsibly manage and rehabilitate sites once they’ve reached the end of their operational life.
Over the past few months, some major steps have been completed. The switchyard has been fully removed, environmental testing is completed and the area is now undergoing final earthworks and reshaping. The generator and turbine equipment have been safely removed from the station and sent for recycling.
The external tail gate structure and internal penstock have now been removed, and permanent isolations have been installed and tested. River levels have been restored to normal operating conditions and we would like to thank local residents and visitors for their patience while river levels have been adjusted to support these works.
The next stage is now underway which includes the fabrication and installation of new stairwells and landing platforms, with construction set to start in July.
We appreciate the community’s understanding and support as this important project continues. As part of recognising the site’s 60 plus years of operating history, AGL is also exploring options to display the original Cairn Curran Power Station nameplate. It will be gifted to a local community group as a lasting connection to the site’s legacy.
To find out more about the project call the AGL Community Hotline.