About the project
The Glenbawn Pumped Hydro Energy Storage (PHES) project (the Project) is proposed to be developed at Glenbawn Dam. The Project progressed following a successful bid by Upper Hunter Hydro Top Trust and its trustee (collectively, Upper Hunter Hydro) in the Renewable Energy Storage Program (RESP), a competitive tender process run by WaterNSW, thereby gaining access to that WaterNSW land.
AGL acquired Upper Hunter Hydro and with it, the Project, in May 2025.
The Project would utilise the existing Glenbawn Dam as the lower reservoir, and would require construction of an upper reservoir and associated electricity generation and transmission infrastructure on WaterNSW land.
The Project is expected to provide up to 7.7 GWh of long-duration electricity storage capacity, and enable the storage and dispatch of electricity into the NEM via transmission connections.